ADDENDUM #1 Rehabilitation of Restrooms in Dorm 503 EARLE C. CLEMENTS JOB CORPS CENTER 2302 US HIGHWAY 60 EAST MORGANFIELD, KY 42437 February 2, 2010 This Addendum forms a part of the Contract Documents and is issued for the purpose of changing the scope of work of this project and/or provides additional essential information. Acknowledge receipt of Addendum in the space provided on the Bid Form. Item 1 - CHANGE OF BID OPENING DATE: Change Bid Opening Date to March 18, 2010 @ 1:00 p.m. Central Time. Item 2 - ADD: Vapor 2 X 2 light fixtures in shower stalls. Four (4) per room, sixteen (16) per project. Item 3 – ADD: GFI protection switch circuits, located at the entrance of the shower stalls. Four (4) per room, sixteen (16) per project. Item 4 – CHANGE: Change from three (3) 3’ X 5’ toilet stall partitions to two (2) 3’ X 5’ toilet stall partitions in each room. Total of Two (2) per room, eight (8) per project. Item 5 – ADD: Extend all toilet partitions out 6”. Item 6 – CHANGE: Replace fluorescent lights with vapor proof T8 fluorescent light. Eight (8) per room, thirty-two (32) per project. Item 7 – ADD: Painting of all walls above the tile and all ceilings with mildew resistant primer and paint. Color to be determined by Center. Item 8 – CHANGE: Replace all existing shower heads to include stainless steel recessed shields and move up 12” from the current position. Four (4) per room, sixteen (16) per project. Item 9 – ADD: Replace emergency lights. Two (2) per room, eight (8) per project. Item 10 – ADD: Replace main switches with motion sensor switches. Two (2) per room, eight (8) per project.