DEPT OF DEFENSE / DEPT OF THE NAVY / NAVFAC / DEPT OF THE NAVY
Design-Bid-Build, P653 Dry Dock Flood Protection Improvements
N40085-20-C-0063ContractAward NoticeSAM.gov
Quick Facts
NAICS
237990
Set-Aside
Full & Open
Place of Performance
Portsmouth, VA
Description
The work includes subsurface cutoff wall for construction of cast-in-place concrete flood wall with manual flood gates, utility valve vaults, and Dry Dock 1 and 3 Caisson gunwale and seal extension and incidental related work in the small dock area of Norfolk Naval Shipyard.