STATEMENT OF WORK U. S. COAST GUARD Temperature Control Valve (TCV) Replacement for CGC JAMES RANKIN and CGC KATHERINE WALKER SECTION 1- GENERAL INFORMATION 1.1 Purpose and Statement of Work 1.1.1 Provide 02 Temperature Control Valve, AMOT, model G-valve, bronze, 3-way, 6” size for the upcoming Drydock for CGC JAMES RANKIN at their homeport and Dockside for CGC KATHERINE WALKER at their homeport respectively. 1.2 Contact for questions Any questions regarding the Statement of Work must be directed at the Availability Project Manager, LTJG Kevin Y. Colon at 787-914-4827. Email at
[email protected] 1.3 Required Delivery Date and Address Required supplies shall be delivered to the address below within 15 weeks of notice of award and tracking info must be supplied within 48 hours of each individual supply being shipped. Below is the information for both cutters: CGC JAMES RANKIN 2401 Hawkins Point Rd, Baltimore, MD 21226 ATTN SCPO Ian Duthie, Cutter EPO, (716) 870-1023 / LTJG Thomas Kenny, Port Engineer, 914-844- 8845 CGC KATHERINE WALKER 85 Port Terminal Blvd Slip 1, Bayonne, NJ. 07002 ATTN SCPO Samuel G Brandenberger, Cutter EPO, (434) 221-9816 / LTJG Raphael Grieco, Port Engineer, (617) 480-8830