MISSISSIPPI RIVER BASIN, LOCK AND DAM 21, QUINCY, IL, BOLTED TAINTER GATE FABRICATION
W912EK26Z1BZ6ContractSpecial Notice9 days leftSAM.gov
Quick Facts
Set-Aside
Full & Open
Description
This project is to fabricate, paint, and deliver bolted Tainter Gates to the Lock and Dam 21 site. These bolted Tainter gates are to be delivered by barge to the site, but may be assembled and painted outside the fabricator's shop or at a thir