AGRICULTURE, DEPARTMENT OF / FOREST SERVICE / USDA FOREST SERVICE
Work includes full bench construction of 250' - 300' of road, and the removal of the slide material which has moved down the bank. From Pierce, Idaho take Highway 11 south for one mile. Turn left onto Forest Service Road 250. Take road 250 approxima | Type: Solicitation | Sol#: AG-0276-S-09-0038
AGRICULTURE, DEPARTMENT OF / FOREST SERVICE / USDA FOREST SERVICE
NOTICE: The scope of work for this project has been reduced by removing some of the road realignment and asphalt work. Please refer to the solicitation package for the current contract requirements. The estimated price is now $25,000 - $100,000. Project consists of the following work: Realign inte
AGRICULTURE, DEPARTMENT OF / FOREST SERVICE / USDA FOREST SERVICE
Road 250 Resurfacing - This project consists of resurfacing approximately 12 miles of Rd. 250 from Cub Creek to Kelly Forks Work Center with aggregate derived from Garners Point Quarry on the Clearwater National Forest. The road requires approximatel | Type: Solicitation | Sol#: AG-0276-S-09-0019
AGRICULTURE, DEPARTMENT OF / FOREST SERVICE / USDA FOREST SERVICE
Priest Lake Ranger District, Bonner County, Idaho - This work consist of repairing a trench created in a washout section of the beach access trail day use area by providing rock and crushed aggregate for backfill, install geotextile material, provide | Type: Solicitation | Sol#: AG-0281-S-09-0008
AGRICULTURE, DEPARTMENT OF / FOREST SERVICE / USDA FOREST SERVICE
St. Joe Ranger District, Shoshone County, Idaho. This project involves the replacement of gabion basket retaining walls on the Red Ives Road #218 starting at milepost 4.4. Existing gabion structures will be replaced with new gabions and a drainage | Type: Solicitation | Sol#: AG-0281-S-08-0035
AGRICULTURE, DEPARTMENT OF / FOREST SERVICE / USDA FOREST SERVICE
All Items Awarded DISREGARD UPLOAD ACTIONS OF JULY 16, 2009 - while uploading a completely different S-09, fiscal year 2009 solicitation with the same ending number as 0045 it was placed here by accident. This notice and associated solication will be archived as i | Type: Solicitation | Sol#: AG
AGRICULTURE, DEPARTMENT OF / FOREST SERVICE / USDA FOREST SERVICE
Telephone requests for hard copies will not be honored as we encourage potential offerers to view or download the soliciation from FedBizOpps. However, should a hard copy be required you may FAX a written request stating the solicitation number AG-0 | Type: Solicitation | Sol#: AG-0281-S-09-0045
AGRICULTURE, DEPARTMENT OF / FOREST SERVICE / USDA FOREST SERVICE
AG-0281-S-08-0058 - Idaho Panhandle National Forests-TALACHE (MIRROR LAKE) TRAIL- Sandpoint Ranger District, Bonner County, Idaho - This work consist of new construction of approximately 2,500sf of parking area including minor clearing and excavation Award terminated effective 10/21/08, may re-adver
AGRICULTURE, DEPARTMENT OF / FOREST SERVICE / USDA FOREST SERVICE
Type: Solicitation | Sol#: AG-0281-S-08-0036
AGRICULTURE, DEPARTMENT OF / FOREST SERVICE / USDA FOREST SERVICE
GENERAL PROJECT DESCRIPTION Kit Price Campground Water System Replacement AG-02RC-S-11-0084 Idaho Panhandle National Forests Coeur d'Alene River Ranger District PRE-BID TOUR: Prospective contractors and interested parties shal | Type: Solicitation | Sol#: AG-02RC-S-11-0084
AGRICULTURE, DEPARTMENT OF / FOREST SERVICE / USDA FOREST SERVICE
The Coeur d'Alene (CDA) Air Tanker base will be advertising a phased project for the completion of retardant storage upgrades. The base proposal shall include placing a reinforced concrete catch basin under the existing storage tanks. The A pre-bid tour was conducted on 8/22/2013. Seven prospectiv
AGRICULTURE, DEPARTMENT OF / FOREST SERVICE / Boise National Forest
REDFISH LAKE ROAD CONSTRUCTION PROJECT -- SAWTOOTH SNRA IN APPROXIMATELY 15 DAY'S, THE SOLICITATION FOR THIS CONSTRUCTION PROJECT WILL BE A | Type: Solicitation | Sol#: AG-0261-S-14-0037
AGRICULTURE, DEPARTMENT OF / FOREST SERVICE / Boise National Forest
The USDA Forest Service New Meadow Ranger District of the Payette National Forests will solicit for the Cold Springs AOP Project. The Contractor shall furnish all labor, materials, equipment, supervision, and transportation necessary to complete this | Type: Solicitation | Sol#: AG-02NV-S-16-0005
DEPT OF DEFENSE / DEPT OF THE ARMY / USACE
Construction Project: Lucky Peak Roller Chain Install. This will be a firm-fixed-price construction contract located at Lucky Peak Dam Boise, ID. Estimated construction magnitude is between $25,000 and $100,000; and 100% performance and payment bonds | Type: Solicitation | Sol#: W912EF-16-Q-0086
AGRICULTURE, DEPARTMENT OF / FOREST SERVICE / Boise National Forest
Redfish Lake Road Phase 2 Project 2017 - Amended AG-0261-S-17-0091 IN APPROXIMATELY 15 DAY'S, THE SOLICITATION FOR THIS CONSTRUCTION PROJECT | Type: Solicitation | Sol#: AG-0261-S-17-0091
DEPT OF DEFENSE / DEPT OF THE ARMY / USACE
Construction project entitled: Carmen Levee Rehabilitation. The construction will occur on the Salmon River Carmen Levee near Salmon, Idaho. Construction magnitude is estimated to be between $250,000 and $500,000. 100% performance and payment bond | Type: Solicitation | Sol#: W912EF18B0021
DEPT OF DEFENSE / DEPT OF THE ARMY / USACE
Construction project entitled: Gooding Diversion Project Rehabilitation. The construction will occur on the Little Wood River near Gooding, Idaho. Construction magnitude is estimated to be between $500,000 and $1,000,000. Performance and payment b | Type: Solicitation | Sol#: W912EF18B0022
AGRICULTURE, DEPARTMENT OF / FOREST SERVICE / Boise National Forest
THIS PROJECT WILL BE AVAILBLE FOR REVIEWING AND PRINTING IN APPROXIMATELY 3 DAYS. Provide and install 1 each 72” x 36’ aluminized steel pipe at Arlis Gulch site. Provide and install 1 each 96” x 40’ aluminized steel pipe at the Hoodoo Creek and Chino | Type: Solicitation | Sol#: AG-0256-S-08-0014
AGRICULTURE, DEPARTMENT OF / FOREST SERVICE / USDA FOREST SERVICE
Bonners Ferry Ranger District, Boundary County, Idaho Panhandl National Forests. Bonners Ferry Slide Repairs: Work involves reconstruction of three(3) roadway embankment failures at three(3) separate locations. Ball Creek - MP 4.50, Trout Creek - M | Type: Solicitation | Sol#: AG-0281-S-08-0033
AGRICULTURE, DEPARTMENT OF / FOREST SERVICE / Boise National Forest
Type: Solicitation | Sol#: AG-0256-S-08-0019
AGRICULTURE, DEPARTMENT OF / FOREST SERVICE / Boise National Forest
THIS PROJECT WILL BE AVAILABLE FOR REVIEWING AND PRINTING IN APPROXIMATELY 15 DAYS. This project consists of replacing the culverts at two crossings at Deadman and Reegan Creeks. Deadman Creek will require removing and disposing of the existing 5 foo | Type: Solicitation | Sol#: AG-0256-S-08-0017
AGRICULTURE, DEPARTMENT OF / FOREST SERVICE / Boise National Forest
THIS PROJECT WILL BE AVAILABLE FOR REVIEWING AND PRINTING IN APPROXIMATELY 15 DAYS. This contract includes repair of the East Fork of South Fork Salmon River Bridge. The bridge is approximately 250 feet long, with three concrete piers, and concrete a AMENDMENT NO. 1 | Type: Solicitation | Sol#: AG-0
AGRICULTURE, DEPARTMENT OF / FOREST SERVICE / Boise National Forest
THIS PROJECT WILL BE AVAILABLE FOR REVIEWING AND PRINTING IN APPROXIMATELY 15 DAYS. The project consists of removing an existing steel truss bridge, modifying the existing abutments for a new structure, pick-up and transport a Government-furnished Ac | Type: Solicitation | Sol#: AG-0267-S-08-0022
AGRICULTURE, DEPARTMENT OF / FOREST SERVICE / Boise National Forest
THIS PROJECT WILL BE AVAILABLE FOR REVIEWING AND PRINTING IN APPROXIMATELY 15 DAYS. The project consists of removing an existing native log bridge and abutments, constructing new treated timber abutments and wingwalls, supplying and installing a prec | Type: Solicitation | Sol#: AG-0267-S-08-0021
AGRICULTURE, DEPARTMENT OF / FOREST SERVICE / Boise National Forest
Type: Solicitation | Sol#: AG-0261-S-08-0048
AGRICULTURE, DEPARTMENT OF / FOREST SERVICE / USDA FOREST SERVICE
Jim Brown Creek Culvert Replacement - This project requires the removal of two existing 48" diameter culverts under Jim Brown Creek Road replaced with at 14'-0" X 48'-0" bottomless arch pipe with two headwalls. This work will also include road grave | Type: Solicitation | Sol#: AG-0276-S-08-0001
AGRICULTURE, DEPARTMENT OF / FOREST SERVICE / Boise National Forest
THIS PROJECT WILL BE AVAILBLE FOR REVIEWING AND PRINTING IN APPROXIMATELY 3 DAYS. The project consists of installing a new stream crossing at North Fork Long Gulch on the Warren Wagon Road. This is on the McCall Ranger District of the Payette Nationa | Type: Solicitation | Sol#: AG-0256-S-08-0013
AGRICULTURE, DEPARTMENT OF / FOREST SERVICE / Boise National Forest
DITCH CREEK BRIDGE REPLACEMENT PROJECT SYNOPSIS – AG-0261-S-09-0006. 100 PERCENT HUBZONE SET-ASIDE. The project consists of clearing; cofferdam construction; structure excavation and backfill; furnishing and installing new timber abutments, timbe | Type: Solicitation | Sol#: AG-0261-S-09-0006
AGRICULTURE, DEPARTMENT OF / FOREST SERVICE / Boise National Forest
TRAPPER CREEK BRIDGE REPLACEMENT PROJECT SYNOPSIS—AG-0261-S-09-0027 100 PERCENT HUBZONE SET-ASIDE. This project consists of the replacement of a native timber bridge with a treated timber bridge on National Forest System Road (NFSR) #440, near Ca | Type: Solicitation | Sol#: AG-0261-S-09-0027
AGRICULTURE, DEPARTMENT OF / FOREST SERVICE / Boise National Forest
100 PERCENT HUBZONE SET-ASIDE. This project consists of a culvert replacement on National Forest System Road #474 (NFSR) near Cascade, Idaho, at Bear Creek. Major items of work include: structure excavation and backfill; culvert removal; clearing an | Type: Solicitation | Sol#: AG-0261-S-09-0043
AGRICULTURE, DEPARTMENT OF / FOREST SERVICE / Boise National Forest
100 PERCENT HUBZONE SET-ASIDE. This project consists of the replacement of a steel structural plate pipe arch on National Forest System Road (NFSR) #025K, near Idaho City, Idaho. Major items of work include: structure excavation and backfill, remova | Type: Solicitation | Sol#: AG-0261-S-09-0042
AGRICULTURE, DEPARTMENT OF / FOREST SERVICE / Boise National Forest
100 PERCENT HUBZONE SET-ASIDE. The Williams Creek Road Reconstruction Project consists of 0.32 mile of road construction and 0.44 miles of road reconstruction on the National Forest System Road (NFSR) #023E. The project is located within the Wil | Type: Solicitation | Sol#: AG-0261-S-09-0046
AGRICULTURE, DEPARTMENT OF / FOREST SERVICE / Boise National Forest
This contract will include replacing the twin culverts at Nasty Creek on the South Fork Salmon River road. The crossing will require removal and disposal of the two 3’ by 4’ arch pipes, and installing one 14 foot span by 44 foot long open bottom co | Type: Solicitation | Sol#: AG-0256-S-09-0008
AGRICULTURE, DEPARTMENT OF / FOREST SERVICE / Boise National Forest
Reconstruction work will be done on thirteen different sections of road in preparation for the Lick Creek Timber sale. Work includes clearing and grubbing, crushed rock surfacing, pit run surfacing, culvert installation, road reconditioning, and inst | Type: Solicitation | Sol#: AG-0256-S-09-0005
AGRICULTURE, DEPARTMENT OF / FOREST SERVICE / USDA FOREST SERVICE
North Caribou Creek Bridge Flood Damage Repair, located in Section 11, R2W, T61N, Boundary County, Idaho on the Bonners Ferry Ranger District, Idaho Panhandle National Forests, for the remediation of flood damage at the North Caribou Creek Bridge si | Type: Solicitation | Sol#: AG-0281-S-08-0027
AGRICULTURE, DEPARTMENT OF / FOREST SERVICE / USDA FOREST SERVICE
The Idaho Panhandle National Forest; Priest Lake Idaho Pend Oreille County, Washington. This project is for the replacement of two existing culvert crossings at the Stagger Inn Campground. One crossing consists of removing two (2) existing 3’6” X 2’ | Type: Solicitation | Sol#: AG-0281-S-09-0029
AGRICULTURE, DEPARTMENT OF / FOREST SERVICE / USDA FOREST SERVICE
The Idaho Panhandle National Forest; Priest Lake Idaho Bonner County, Idaho. This project is for the removal of an existing corrugated steel culvert on Canyon Creek and replacing it with a structural-plate open bottom arch culvert on concrete footing | Type: Solicitation | Sol#: AG-0281-S-09-0034
AGRICULTURE, DEPARTMENT OF / FOREST SERVICE / USDA FOREST SERVICE
CEDAR GROVE TRAIL BRIDGES. This is a project for the replacement of 3 (Government-furnished) trail bridges. Work consists of the removal of three (3) existing structurally deficient log trail bridge superstructures or the remnants of the trail brid | Type: Solicitation | Sol#: AG-0281-S-09-0044
AGRICULTURE, DEPARTMENT OF / FOREST SERVICE / USDA FOREST SERVICE
Sandpoint Ranger District , Idaho Panhandle National Forest Bonner County , Idaho This solicitation is Invitation For Bids (IFB) The Trestle Creek Road Resurfacing Project involves preparation of the existing roadbed and the placement of cru | Type: Solicitation | Sol#: AG-0281-S-09-0047
AGRICULTURE, DEPARTMENT OF / FOREST SERVICE / USDA FOREST SERVICE
Sandpoint Ranger District, Idaho Panhandle National Forests, Bonner County, Idaho. The purpose of this contract is to decommission multiple roads, approx. 19.52 miles. Work includes but not limited to: clearing, excavation, constructing waterbars, ri | Type: Solicitation | Sol#: RFP-AG-0281-S-09-005
AGRICULTURE, DEPARTMENT OF / FOREST SERVICE / USDA FOREST SERVICE
Sandpoint Ranger District, Boundary County, Idaho. The Beehive Trail Bridge involves the removal of the existing solid sawn stringer trail bridge structure over Pack River and replacing it with a new Government furnished steel Half-Through Pony Truss | Type: Solicitation | Sol#: AG-0281-S-09-0030
AGRICULTURE, DEPARTMENT OF / FOREST SERVICE / USDA FOREST SERVICE
CEDAR GROVE TRAIL BRIDGES. This is a project for the replacement of 3 (Government-furnished) trail bridges. Work consists of the removal of three (3) existing structurally deficient log trail bridge superstructures or the remnants of the trail brid | Type: Solicitation | Sol#: AG-0281-S-09-0041
AGRICULTURE, DEPARTMENT OF / FOREST SERVICE / USDA FOREST SERVICE
CORNWALL & TELICHPAH TRAIL BRIDGES. This is two(2) separate projects for the replacement of multiple (total 5) (Government-furnished) trail bridges. Cornwall portion consists of the removal of three (3) existing structurally deficient failed bridg | Type: Solicitation | Sol#: AG-0281-S-09-0038
AGRICULTURE, DEPARTMENT OF / FOREST SERVICE / Boise National Forest
THIS SOLICITATION WILL BE AVAILABLE FOR REVIEWING AND PRINTING IN APPROXIMATELY 15 DAYS. The purpose and intent of this solicitation is to contract for the construction of Footbridge Abutments on the Ketchum Ranger District, Sawtooth National Forest. | Type: Solicitation | Sol#: AG-0261-S-10-0100
DEPT OF DEFENSE / DEPT OF THE AIR FORCE / ACC
This project is to repair the apron in front of Hanger 1330 at Mountain Home Air Force Base. The scope of the project includes demolition and reconstruction of Portland cement concrete pavement. These major project elements include all related tas | Type: Solicitation | Sol#: FA4897-12-B-0007
AGRICULTURE, DEPARTMENT OF / FOREST SERVICE / USDA FOREST SERVICE
This project consists of the construction of a Structural-Plate Arch culvert on Forest Service Road No. 223, milepost 10.66 at the Boyd Creek crossing. This project involves the removal of an existing 78" culvert and the replacement w This is notification to all interested contractors that award of
AGRICULTURE, DEPARTMENT OF / FOREST SERVICE / USDA FOREST SERVICE
Description of Work This project consists of three general locations along Forest Service Road 1007. One location is near the jct of road 408 road and another location near the jct of road 632 and the third location located app | Type: Solicitation | Sol#: AG-02RC-S-13-0119
AGRICULTURE, DEPARTMENT OF / FOREST SERVICE / USDA FOREST SERVICE
Idaho Panhandle National Forests, St Joe Ranger District, AWC Repaving to repair and pave the Dunn Peak Road 1934, from the town of Avery to the FS work center. Remove remaining asphalt, repaving the entire road for approx. 300 ft. Work also includes | Type: Solicitation | Sol#: AG-02RC-S-13-0138
TRANSPORTATION, DEPARTMENT OF / FEDERAL HIGHWAY ADMINISTRATION / 690567 WESTERN FEDERAL LANDS DIV
PROJECT: ID PFH 91(1), Williams Creek (Shoup) Bridge Replacement, Lemhi County, Idaho LOCATION: 5 miles south of Salmon, Idaho WORK: This project consists of replacing the existing Williams Creek (Shoup) Bridge with a two-lane structure and | Type: Solicitation | Sol#: DTFH7016B00008
AGRICULTURE, DEPARTMENT OF / FOREST SERVICE / USDA FOREST SERVICE
East Fork Boulder Road Repair on the Bonners Ferry Ranger District. This Project involves improving on an existing roadbed that has little surfacing material remaining. The work will be to repair existing Low Water Ford Crossing, by hauling in | Type: Solicitation | Sol#: AG-02RC-S-16-0121