AGRICULTURE, DEPARTMENT OF / FOREST SERVICE / Alaska Regional Office, R10
The Forest Service contemplates releasing a solicitation numbered AG-0109-S-07-0005 on or about April 20, 2007, for the Tuxekan Island Roads project. Whether it does so may depend on the outcome of the appeals process for the Tuxekan Island Timber Sa | Type: Presolicitation | Sol#: AG-0109-S-07-0005
AGRICULTURE, DEPARTMENT OF / FOREST SERVICE / ROGUE RIVER-SISKIYOU NATL FOREST
This modification to the previous notice changes the Total Small Business Set-aside to NOT APPLICABLE (N/A). All else remains unchanged. The base item of this project includes the reconstruction of recreation sites and road improvements along the Il | Type: Presolicitation | Sol#: AG-04N7-S-07-0057
AGRICULTURE, DEPARTMENT OF / FOREST SERVICE / USDA FOREST SERVICE
Doe Creek Road Improvement - Work consists of drainage improvements along 4 miles of Road 566 including replacing 3 culverts in small fish bearing tributaries with 60" round pipes (approximately). Other work includes reshaping the road surface (insl | Type: Presolicitation | Sol#: R1-5-07-029
In accordance with the Agreement of Defense and Cooperation between the Kingdom of Spain and the United States of America, any contract resulting from this notice/solicitation can only be entered into with companies authorized to carry out these acti | Type: Presolicitation | Sol#: FA5575-07-R-0017
AGRICULTURE, DEPARTMENT OF / FOREST SERVICE / Alaska Regional Office, R10
Invitation for Bid - Total Hub-Zone Set-aside. GENERAL DESCRIPTION: The purpose of this contract is for routine road maintenance on single lane road, south of Kake Alaska for base bid and 2 option items. Base bid is for approximately 34 | Type: Presolicitation | Sol#: AG-0116-S-07-0031
AGRICULTURE, DEPARTMENT OF / FOREST SERVICE / Alaska Regional Office, R10
REQUEST FOR QUOTE: TOTAL HUB-ZONE SET-ASIDE GENERAL DESCRIPTION: The purpose of this contract is for furnishing and placing riprap, borrow and installation of for replacement culverts between mileposts 19 and 21 on the Three Lakes Loop | Type: Presolicitation | Sol#: AG-0116-S-07-0033
AGRICULTURE, DEPARTMENT OF / FOREST SERVICE / Alaska Regional Office, R10
REQUEST FOR QUOTES GENERAL DESCRIPTION: The intent of this contract is to place approximately six miles of forest roads in storage by removing culverts, constructing waterbars, excavating roadway material, outsloping road surface | Type: Presolicitation | Sol#: AG-0116-S-07-0042
AGRICULTURE, DEPARTMENT OF / FOREST SERVICE / Alaska Regional Office, R10
REQUEST FOR QUOTES GENERAL DESCRIPTION: The intent of this contract is to remove and dispose of a destroyed native log stringer trail bridge and install a new 34-foot glulam trail bridge. PROJECT LOCATION: The proje | Type: Presolicitation | Sol#: AG-0116-S-07-0046
AGRICULTURE, DEPARTMENT OF / FOREST SERVICE / Alaska Regional Office, R10
This project is a Total Hub-Zone Set-Aside. GENERAL PROJECT DESCRIPTION: This project involves developing and expanding an existing quarry for aggregate production; producing, placement and compaction of aggregate to a 6 inch depth; a | Type: Presolicitation | Sol#: AG-0116-S-07-0035
AGRICULTURE, DEPARTMENT OF / FOREST SERVICE / Alaska Regional Office, R10
The Forest Service contemplates releasing a solicitation numbered AG-0116-S-07-0047 on or about August 1, 2007, for the Sandy Beach Fish Passage Improvement Project. Prospective bidders should visit this FedBizOpps website on or about August 1, 2007, | Type: Presolicitation | Sol#: AG-0116-S-07-0047
AGRICULTURE, DEPARTMENT OF / FOREST SERVICE / LOLO NATIONAL FOREST
The Western Montana Acquisition Zone anticipates awarding a contract on the Flathead National Forest for some Best Management Practices watershed work. The project will consist of work on approximately 9 miles of Elk Creek Road #9591 to improve drai | Type: Presolicitation | Sol#: AG-03R6-S-07-0124
AGRICULTURE, DEPARTMENT OF / FOREST SERVICE / LOLO NATIONAL FOREST
The Western Montana Acquisition Zone anticipates awarding a contract for road paving on the Flathead National Forest. The project consists of reconstructing 0.62 miles of the Canyon Creek Road No. 316 to a double lane standard from its junction with | Type: Presolicitation | Sol#: AG-03R6-S-07-0129
DEPT OF DEFENSE / DEPT OF THE AIR FORCE / AFDW
This is an Indefinite Delivery Requirements Contract for Repair Existing Family Housing Roads, Base Roads, Parking Lots and to Construct New Pavements at Andrews Air Force Base, MD. The work includes, but is not limited to: Provide general site e | Type: Presolicitation | Sol#: FA4416-07-R-0001
DEPT OF DEFENSE / DEPT OF THE AIR FORCE / AETC
*****PLEASE NOTE: THIS SYNOPSIS WAS PREVIOUSLY POSTED ON 17 JUL 06 AND DELETED ON 24 JUL 06 WITHOUT A CANCELLATION NOTICE. THIS POSTING IS BEING ACCOMPLISHED ONLY SO THAT A CANCELLATION NOTICE MAY BE CREATED. THIS SYNOPSIS IS NOT BEING POSTED TO A | Type: Presolicitation | Sol#: F2R3C46155A100
AGRICULTURE, DEPARTMENT OF / FOREST SERVICE / MT BAKER SNOQUALMIE NATIONAL FOREST
THIS SOLICITATION HAS BEEN CANCELLED. | Type: Presolicitation | Sol#: R6-MBS-4-51
AGRICULTURE, DEPARTMENT OF / FOREST SERVICE / MT BAKER SNOQUALMIE NATIONAL FOREST
The USDA Forest Service has a project consisting of routine and reoccurring maintenance of forest roads on the Mt. Baker-Snoqualmie National Forest. The solicitation will result in an Indefinite Delivery Indefinite Quantity contract(s)with up to four | Type: Presolicitation | Sol#: R6-MBS-4-11
AGRICULTURE, DEPARTMENT OF / FOREST SERVICE / MT BAKER SNOQUALMIE NATIONAL FOREST
THIS SOLICITATION WAS CANCELLED AND WILL BE RE-ISSUED. | Type: Presolicitation | Sol#: R6-5-04-47
DEPT OF DEFENSE / DEPT OF THE AIR FORCE / AETC
DynCorp Technical Services a CSC Company (DTS) contemplates issue of an Unfunded Request For Proposal (URFP) for the extension of Gott Road at Vance AFB, OK as solicitation number URFP060P. Funds are not currently available for this solicitation. T | Type: Presolicitation | Sol#: URFP060P
DEPT OF DEFENSE / DEPT OF THE AIR FORCE / AETC
This solicitation will also be an Unfunded Request For Proposal (URFP) Solicitaion number will be URFP072P. This project has Fill or Kill authority. Fill or Kill authority projects may be funded with only FY04 fallout money that may become available | Type: Presolicitation | Sol#: RFP072PCorrection
DEPT OF DEFENSE / DEPT OF THE AIR FORCE / AETC
DynCorp Technical Services a CSC Company (DTS) contemplates issue of a solicitation for an Indefinite Delivery Indefinite Quantity (IDIQ) contract. IDIQ term is expected to be up to three (3) years. IDIQ is for Maintaining Airfield Pavements Paint | Type: Presolicitation | Sol#: RFP072P
AGRICULTURE, DEPARTMENT OF / FOREST SERVICE / GIFFORD PINCHOT NATIONAL FOREST
Mouse Creek Fish Passage. The Gifford Pinchot National Forest is soliciting prospective contractors for the removal of two steel culverts and the construction of a pre-stressed concrete bridge, on the Mt. Adams Ranger District. Project is located o | Type: Presolicitation | Sol#: AG-05K3-S-06-0005
AGRICULTURE, DEPARTMENT OF / FOREST SERVICE / GIFFORD PINCHOT NATIONAL FOREST
Installing and constructing barriers at eight sites around the Silver Star area. The barriers to be installed are root wads, boulders and bollards. The barriers to be constructed are trenches and grading out road sections to existing side slope con | Type: Presolicitation | Sol#: R6-GIP-5-003
AGRICULTURE, DEPARTMENT OF / FOREST SERVICE / GIFFORD PINCHOT NATIONAL FOREST
*******************PRESOLICITATION NOTICE******************* This project involves - Excavation and sub grade preparation including associated clearing, furnishing and placement of aggregate and asphalt to Atkisson Sno-Park. This project is located | Type: Presolicitation | Sol#: R6-GIP-5-019
AGRICULTURE, DEPARTMENT OF / FOREST SERVICE / GIFFORD PINCHOT NATIONAL FOREST
This project will convert an existing gravel surfaced parking area to an asphalt surfaced facility. The existing gravel surface will be scarified, processed, watered and compacted prior to the placement of a lift of crushed rock to provide a base for | Type: Presolicitation | Sol#: AG-05K3-S-05-0020
AGRICULTURE, DEPARTMENT OF / FOREST SERVICE / GIFFORD PINCHOT NATIONAL FOREST
Repair existing drainage facilities, construct new water bars. Spot excavation and haul. New metal gate, new road closure berm. Location: From Battleground WA proceed North via State Highway 503 to NE Rock Creek Rd at mile post 13.8. Proceed Eas | Type: Presolicitation | Sol#: R6-GIP-4-020
AGRICULTURE, DEPARTMENT OF / FOREST SERVICE / GIFFORD PINCHOT NATIONAL FOREST
**************PRESOLICITATION NOTICE************** Washington State, Skamania County Yellowjacket Road Decommission 1.Removal of all cross drains and installation of cross ditches to divert road surface water flow. 2.Removal of existing bridge on FR | Type: Presolicitation | Sol#: R6-GIP-5-024
AGRICULTURE, DEPARTMENT OF / FOREST SERVICE / GIFFORD PINCHOT NATIONAL FOREST
The Gifford Pinchot National Forest is soliciting prospective contractors for road decommissioning work. This project decommissions 1.94 miles of the 2517035 road. This results in the removal of 12 existing culverts, the installation of 11 cross dit | Type: Presolicitation | Sol#: AG-05K3-S-07-0068
AGRICULTURE, DEPARTMENT OF / FOREST SERVICE / GIFFORD PINCHOT NATIONAL FOREST
**********PRESOLICITATION NOTICE************* Washington State, Lewis County. This project decommissions the last 3,150 feet of the 7600014 road. This results in the excavation of approximately 14,800 cubic yards of material. After the project appro | Type: Presolicitation | Sol#: R6-GIP-5-016
AGRICULTURE, DEPARTMENT OF / FOREST SERVICE / GIFFORD PINCHOT NATIONAL FOREST
*****************PRESOLICITATION NOTICE************************* The objective of Iron Creek Road Stabilization Project is to replace culverts with larger structures capable of passing 100 year flows, sediment and likely large wood. The project will | Type: Presolicitation | Sol#: R6-GIP-5-012
AGRICULTURE, DEPARTMENT OF / FOREST SERVICE / GIFFORD PINCHOT NATIONAL FOREST
USFS RD 4200 Enhancement Phase 1. This project will improve drainage and reduce road-generated sediment in the East Fork of the Lewis River. Vicinity Maps and Project Drawings will be provided when Solicitation is issued. Government Estimate: $250 | Type: Presolicitation | Sol#: R6-GIP-5-018
AGRICULTURE, DEPARTMENT OF / FOREST SERVICE / GIFFORD PINCHOT NATIONAL FOREST
This project will repair existing Recreation Facilities adjacent to USFS Rd 99. The majority of the work will be located at Windy Ridge. Location: From Interstate 5 at Exit 68 proceed East via Highway 12 to Randle Washington. Exit Hwy 12 at Randl | Type: Presolicitation | Sol#: R6-GIP-5-008
AGRICULTURE, DEPARTMENT OF / FOREST SERVICE / GIFFORD PINCHOT NATIONAL FOREST
The Gifford Pinchot National Forest, Washington, intends to acquire by contract repair of Forest Service Road No. 25. The contract includes: asphalt skin patching; minor realignment; production and placement of aggregate; removal and replacement | Type: Presolicitation | Sol#: AG-05G20S-07-040
AGRICULTURE, DEPARTMENT OF / FOREST SERVICE / GIFFORD PINCHOT NATIONAL FOREST
The purpose of the 84 Bridge Replacement is to replace the existing 62 foot long, single-lane, log stringer-bridge with an 80 foot long, single-lane steel bridge. Work will involve removal of existing log bridge located and installing the steel brid | Type: Presolicitation | Sol#: AG-05K3-S-06-0035
AGRICULTURE, DEPARTMENT OF / FOREST SERVICE / Rocky Mountain Regional Office
The USDA Forest Service Region 2 Bighorn National Forest has a requirement for the removal and disposal of an existing log stringer bridge and replacement with a bottomless corrugated metal pipe. The performance period of this contract is 60 calenda | Type: Presolicitation | Sol#: RMAST-04-116
AGRICULTURE, DEPARTMENT OF / FOREST SERVICE / USDA FOREST SERVICE
The Project involves the construction of a new paved entrance road and parking area. Work includes clearing & grubbing, excavation, crushed aggregate, asphalt pavement, concrete curb, topsoil, and seeding with mulch. | Type: Presolicitation | Sol#: HM-06-125
AGRICULTURE, DEPARTMENT OF / FOREST SERVICE / USDA FOREST SERVICE
Work involves an asphalt overlay of 1.25 miles of existing road, parking lots, and camping spurs. Other items of work include topsoil and seed with mulch. | Type: Presolicitation | Sol#: HM-06-124
AGRICULTURE, DEPARTMENT OF / FOREST SERVICE / Boise National Forest
THIS PROJECT HAS A NEW SOLICITATION NUMBER. THE NEW NUMBER WILL REPLACE THE RFP-R4-17-05-05. NEW NUMBER IS AG-9360-S-05-0010. A SYNOPSIS WILL BE CREATED WITH THE NEW NUMBER. PLEASE REGISTER UNDER THE NEW NUMBER IF YOU WISH TO RECEIVE E-MAILS IN REG | Type: Presolicitation | Sol#: RFP-R4-17-05-05
AGRICULTURE, DEPARTMENT OF / FOREST SERVICE / USDA FS OLYMPIC NATIONAL FOREST
R6-OLY-4-15-O Design Build Construction of Two Retaining WallsOlympic National Forest Posted 04 May 2004-- Analyze suitability of alternative types of retaining wall and complete design of selected alternative retaining wall on FS RD 2923, at | Type: Presolicitation | Sol#: R6-OLY-4-15-O
AGRICULTURE, DEPARTMENT OF / FOREST SERVICE / MT BAKER SNOQUALMIE NATIONAL FOREST
Type: Presolicitation | Sol#: R6-5-06-12
AGRICULTURE, DEPARTMENT OF / FOREST SERVICE / MT BAKER SNOQUALMIE NATIONAL FOREST
Type: Presolicitation | Sol#: R6-5-06-14
AGRICULTURE, DEPARTMENT OF / FOREST SERVICE / MT BAKER SNOQUALMIE NATIONAL FOREST
Type: Presolicitation | Sol#: R6-5-06-27
AGRICULTURE, DEPARTMENT OF / FOREST SERVICE / MT BAKER SNOQUALMIE NATIONAL FOREST
Type: Presolicitation | Sol#: R6-MBS-6-26
AGRICULTURE, DEPARTMENT OF / FOREST SERVICE / MT BAKER SNOQUALMIE NATIONAL FOREST
Type: Presolicitation | Sol#: R6-OLY-5-0023
AGRICULTURE, DEPARTMENT OF / FOREST SERVICE / MT BAKER SNOQUALMIE NATIONAL FOREST
This project consists of the installation of an 80' Government-furnished Hamilton EZ bridge to replace an exisitng 50' EZ bridge. Work includes but is not limited to clearing, modular bridge removal & installation, excavation & embankment, gabion rem | Type: Presolicitation | Sol#: R6-MBS-4-31
AGRICULTURE, DEPARTMENT OF / FOREST SERVICE / MT BAKER SNOQUALMIE NATIONAL FOREST
This project consists of drainage improvement work on Forest Service Roads 1715, 1715011 and a bridge replacement on Road 1715. The drainage work includes but is not limited to: replacing & installing culverts; culvert bedding & borrow material; inst | Type: Presolicitation | Sol#: R6-MBS-5-33
AGRICULTURE, DEPARTMENT OF / FOREST SERVICE / MT BAKER SNOQUALMIE NATIONAL FOREST
This project consists of drainage improvement work on Forest Service Roads 1152 and 1152-014. Work includes but is not limited to removal and installation of culverts (some culverts will be Government furnished), excavation, backfill with compaction, | Type: Presolicitation | Sol#: R6-5-05-25
AGRICULTURE, DEPARTMENT OF / FOREST SERVICE / MT BAKER SNOQUALMIE NATIONAL FOREST
This project consists of replacement of an existing 36 inch culvert with a 2300mm span x 1800mm rise, steel arch culvert at eash site. Work includes but is not limited to placement of riprap, crushed gravel, erosion control and equipment rental. Est | Type: Presolicitation | Sol#: R6-MBS-5-29
AGRICULTURE, DEPARTMENT OF / FOREST SERVICE / MT BAKER SNOQUALMIE NATIONAL FOREST
This modification provides information omitted from the initial notice. The Governments estimated price range for this project is between $25,000 and $100,000. Payment security will be required for this project. | Type: Presolicitation | Sol#: R6-MBS-5-35
AGRICULTURE, DEPARTMENT OF / FOREST SERVICE / MT BAKER SNOQUALMIE NATIONAL FOREST
This project is for the installation of a 96 inch culvert at Forest Service Road 2081 MP 2.3 and road re-alignment at Road 2430 MP 3.6. Work includes but is not limited to construction staking, contractor furnished 96 inch x 58 inch corrugated metal | Type: Presolicitation | Sol#: R6-MBS-6-37
AGRICULTURE, DEPARTMENT OF / FOREST SERVICE / MT BAKER SNOQUALMIE NATIONAL FOREST
(This project has been re-named as the North Fork Nooksack bridges installation). This project consists of the installation of up to (4) four pre-fabricated bridges in the North Fork Nooksack drainage. The bridges include Upper Canyon #3170-1.1, Razo | Type: Presolicitation | Sol#: R6-5-06-29