DEPT OF DEFENSE / DEPT OF THE NAVY / MILITARY SEALIFT FLT SUPP CMD NORF
PROVIDE AND REPLACE INTERIOR JOINER BULKHEADS IN VARIOUS SPACES ONBOARD THE USNS ZEUS | Type: Presolicitation | Sol#: N40442-08-T-5035
AGRICULTURE, DEPARTMENT OF / FOREST SERVICE / Alaska Regional Office, R10
REQUEST FOR QUOTES: This is a Total Hub-Zone Set-Aside. GENERAL DESCRIPTION: This project involves the demolition of the existing Swan Observatory and the construction of a new observatory. Work also involves modification of | Type: Presolicitation | Sol#: AG-0116-S-07-0052
AGRICULTURE, DEPARTMENT OF / FOREST SERVICE / LOLO NATIONAL FOREST
The Flathead National Forest, Tally Lake Ranger District, is advertising a Pre-Solicitation Prospectus for the the Upper Stillwayter Lake Campground located in Flathead County, Montana. The project consists of heavy maintenance to access Road No. 28 | Type: Presolicitation | Sol#: Prospectus_011001
HOMELAND SECURITY, DEPARTMENT OF / U.S. COAST GUARD / CEU OAKLAND(00088)
This is notice that the Proposal Due Date is suspended until further notice. | Type: Presolicitation | Sol#: HSCG8806R623396
AGRICULTURE, DEPARTMENT OF / FOREST SERVICE / MT BAKER SNOQUALMIE NATIONAL FOREST
This project is for the construction of a 45-unit campground and adjacent day use picnic area on a 30 acre site on the Snoqualmie Ranger District. The jobsite is located at the 1200' elevation, approx 22 miles northeast of North Bend, WA and is usual | Type: Presolicitation | Sol#: R6-5-04-15
AGRICULTURE, DEPARTMENT OF / FOREST SERVICE / GIFFORD PINCHOT NATIONAL FOREST
This project includes but is not limited to haul and placement of boulders, installation of guardrail sections to better delineate campsites or block roads, applying pit run aggregate at spot locations to improve drainage and harden surfaces, constru | Type: Presolicitation | Sol#: R6-MBS-6-23
AGRICULTURE, DEPARTMENT OF / FOREST SERVICE / Rocky Mountain Regional Office
This project shall consist of drilling, casing, and development of a groundwater well for the Crandall Ranger Staion located on the Shoshone National Forest. The period of performance will be 30 days. The NAICS code is 237990, size standard $28.5 m | Type: Presolicitation | Sol#: RMAST-04-075
AGRICULTURE, DEPARTMENT OF / FOREST SERVICE / Rocky Mountain Regional Office
This project is a RFP for the Carrizo Canyon Picnic area improvements. Located in Baca County, on the Pike San Isabel Natl. Forest, Comanche National Grasslands, approx. 35 miles SW of Springfield, Colorado on the SE 1/4 of the SE 1/4 of Section 27 | Type: Presolicitation | Sol#: AG-82X9-S-06-0202
AGRICULTURE, DEPARTMENT OF / FOREST SERVICE / USDA FOREST SERVICE
Work involves the construction of several small dams. Work includes clearing and grubbing, removing existing beaver dams, placing embankment, installing water control structures and pipe spillways, installing chain link mesh, placing riprap, and pla | Type: Presolicitation | Sol#: HM-06-069
AGRICULTURE, DEPARTMENT OF / FOREST SERVICE / Boise National Forest
THIS PROJECT IS DELETED IN ITS ENTIRETY AND WILL BE ISSUED UNDER A NEW SOLICITATION NUMBER. | Type: Presolicitation | Sol#: IFB-R4-12-05-07
AGRICULTURE, DEPARTMENT OF / FOREST SERVICE / USDA FS OLYMPIC NATIONAL FOREST
The U. S. Department of Agriculture, Olympic National Forest, is issuing a Request for Proposal for the Newbury Creek Culvert Replacement. This project, located on the Pacific Ranger District (Quinault), involves providing and installing a 7620 mm | Type: Presolicitation | Sol#: R6-OLY-4-14-O
AGRICULTURE, DEPARTMENT OF / FOREST SERVICE / MT BAKER SNOQUALMIE NATIONAL FOREST
Type: Presolicitation | Sol#: R6-5-07-35
AGRICULTURE, DEPARTMENT OF / FOREST SERVICE / MT BAKER SNOQUALMIE NATIONAL FOREST
CORRECTION TO PREVIOUS NOTICEThe solicitation for this project is being handled by the North Cascades Complex, National Park Service. Go to the following website and search for the solicitation number listed below. Website is http://ideasec.nbc.gov a | Type: Presolicitation | Sol#: R6-5-05-10
AGRICULTURE, DEPARTMENT OF / FOREST SERVICE / MT BAKER SNOQUALMIE NATIONAL FOREST
This project consists of three fish passage sites on FS Road #38. Probable designs are as follows: MP 10.53 - bottomless arch of about 16-18 ft span; MP 11.30 - bottomless arch of approx 16-18 ft span or a bridge; MP 11.86 - bridge of approx 70-90 ft | Type: Presolicitation | Sol#: R6-5-05-11
AGRICULTURE, DEPARTMENT OF / FOREST SERVICE / USDA FOREST SERVICE
Coeur dAlene River Ranger District, Shoshone County, Idaho. This solicitation describes stream restoration work in Brett Creek. The work will consist of installing fish habitat improvement structures such as V-Structures, Angled Step-Downs, and Cov | Type: Presolicitation | Sol#: RFQ-R1-04-04-35
AGRICULTURE, DEPARTMENT OF / FOREST SERVICE / USDA FOREST SERVICE
St. Joe Ranger District, Shoshone County, Idaho. Trail restoration with some relocation, starting on the north at Sawtooth Saddle and running south. Items include one base item consisting of 2.55 miles of restoration (reconstruction) and 0.35 miles | Type: Presolicitation | Sol#: RFQ-R1-04-04-64
AGRICULTURE, DEPARTMENT OF / FOREST SERVICE / USDA FOREST SERVICE
St. Joe Ranger District, Shoshone County, Idaho. Consists of fisheries habitat improvement by placement of single and multiple cover logs at pre-determined locations in three project reaches in approximately 2 miles of stream to increase cover for f | Type: Presolicitation | Sol#: RFQ-R1-04-04-59
AGRICULTURE, DEPARTMENT OF / FOREST SERVICE / USDA FOREST SERVICE
Coeur d’Alene River Ranger District, Shoshone County, Idaho. Furnish all labor, materials, equipment, supervision, and transportation necessary to install underground potable water system in accordance with the drawings and specifications. Place an | Type: Presolicitation | Sol#: RFQ-R1-04-04-60
AGRICULTURE, DEPARTMENT OF / FOREST SERVICE / USDA FOREST SERVICE
The Idaho Panhandle National Forests has cancelled the Request for Quotes for Shoshone Park, Solicitation #AG-0281-S-06-0054 on the Coeur d?Alene River Ranger District. At this time there are plans to readvertise in 2007. We appreciate your interes | Type: Presolicitation | Sol#: AG-0281-S-06-0054
AGRICULTURE, DEPARTMENT OF / FOREST SERVICE / USDA FOREST SERVICE
Type: Presolicitation | Sol#: AG-0281-S-07-0045
AGRICULTURE, DEPARTMENT OF / FOREST SERVICE / Alaska Regional Office, R10
GENERAL PROJECT DESCRIPTION: This project is comprised of work on Forest Trail 575, Thoms Lake Trail. Work includes but is not limited to construction of turnpikes and treated timber bridges, installation of culverts and decking, and remo | Type: Presolicitation | Sol#: AG-0116-S-07-0055
DEPT OF DEFENSE / DEPT OF THE AIR FORCE / PACAF
Type: Presolicitation | Sol#: FA5004-07-R-C017
AGRICULTURE, DEPARTMENT OF / FOREST SERVICE / USDA FOREST SERVICE
St Joe Ranger District, Shoshone County, Idaho. Project consists of contructing a 15 ft x 7ft 9 in. x 64 ft structural plate arch at mile post 1.45 on NFS Road 1222. The arch replaces an existing culvert that will be removed in an effort to improve | Type: Presolicitation | Sol#: AG-0281-S-07-0039
AGRICULTURE, DEPARTMENT OF / FOREST SERVICE / USDA FOREST SERVICE
MODIFIED Sandpoint Ranger District, Bonner County, Idaho. This project is for the remediation of flood damage at three sites in the Pack River Drainage. Sites consists of raising the existing road grade using imported material and installing culvert | Type: Presolicitation | Sol#: AG-0281-S-07-0042
AGRICULTURE, DEPARTMENT OF / FOREST SERVICE / USDA FOREST SERVICE
Sandpoint Ranger District, Idaho Panhandle National Forests is requesting quotes for the grubbing, excavation and embankment of approximately 18,950 LF of trail tread. Clearing will be completed by the Forest Service. All cut logs, trees, brush, bra | Type: Presolicitation | Sol#: AG-0281-S-07-0029
AGRICULTURE, DEPARTMENT OF / FOREST SERVICE / USDA FOREST SERVICE
Type: Presolicitation | Sol#: AG-0281-S-07-0046
AGRICULTURE, DEPARTMENT OF / FOREST SERVICE / USDA FOREST SERVICE
Type: Presolicitation | Sol#: AG-0281-S-07-0051
AGRICULTURE, DEPARTMENT OF / FOREST SERVICE / USDA FOREST SERVICE
Type: Presolicitation | Sol#: AG-0281-S-07-0043
DEPT OF DEFENSE / DEPT OF THE ARMY / USACE
The project consists primarily of constructing a structural steel trash rack in the inlet of the old Mounds Creek Culvert. This will involve some inlet channel excavations; the driving of H-piling | Type: Presolicitation | Sol#: W912EQ-08-B-0010
DEPT OF DEFENSE / DEPT OF THE NAVY / NAVFAC
Photos could not be attached to EuroNeco | Type: Presolicitation | Sol#: N3319108R0106
DEPT OF DEFENSE / DEPT OF THE AIR FORCE / AFGSC
Dyess Air Force Base is seeking qualified sources capable of rebuilding 3 teeing areas and reshape/rebuild all 12 bunkers at the Mesquite Grove Golf Course in accordance the statement of work. The estimated project magnitude is between $100,000 and | Type: Presolicitation | Sol#: FA4661-08-R-0005
AGRICULTURE, DEPARTMENT OF / FOREST SERVICE / MT BAKER SNOQUALMIE NATIONAL FOREST
Type: Presolicitation | Sol#: R6-5-07-25
HOMELAND SECURITY, DEPARTMENT OF / U.S. COAST GUARD / BASE KODIAK(00045)
Type: Presolicitation | Sol#: HSCG45-08-Q-K3087
AGRICULTURE, DEPARTMENT OF / FOREST SERVICE / Alaska Regional Office, R10
The purpose of this contract is for the designing and construction of a new concrete bulkhead, a low angle equipment ramp, 627 meters of access raod, 500 meters of fencing, general site drainage work at the existing Thorne Bay Marine Access Facility. | Type: Presolicitation | Sol#: R10-05-04-34
AGRICULTURE, DEPARTMENT OF / FOREST SERVICE / Alaska Regional Office, R10
The purpose of this contract is to reconstruct a low angle equipment ramp to a uniform gradient of 14% at the Woodpecker Marine Access Facility. Work will include excavation, backfill and compaction, placement of geotextile fabric, fabricating, ship | Type: Presolicitation | Sol#: R10-05-04-035
AGRICULTURE, DEPARTMENT OF / FOREST SERVICE / Alaska Regional Office, R10
This project is being cancelled in its entirety. No award will be made. | Type: Presolicitation | Sol#: R10-05-04-36
AGENCY FOR INTERNATIONAL DEVELOPMENT / AGENCY FOR INTERNATIONAL DEVELOPMENT / USAID/AFGHANISTAN
USAID Regional Development Mission/Asia, Afghanistan Procurement Support Office in conjunction with USAID/Afghanistan intends to issue solicitations for 4 single-holder Indefinite Quantity Contracts (IQCs) for construction programs in 4 infrastructur | Type: Presolicitation | Sol#: 306-05-APSO-OIEE
AGENCY FOR INTERNATIONAL DEVELOPMENT / AGENCY FOR INTERNATIONAL DEVELOPMENT / USAID/AFGHANISTAN
The United States Agency for International Development (USAID) is seeking proposals to procure technical assistance necessary to address Afghanistan’s Transport Sector, which can include the rehabilitation of existing road network systems and civil a | Type: Presolicitation | Sol#: 306-05-007APSO
AGENCY FOR INTERNATIONAL DEVELOPMENT / AGENCY FOR INTERNATIONAL DEVELOPMENT / USAID/AFGHANISTAN
This Notice was posted on December 23, 2004 and it has been re-uploaded due to technical problems. The US Agency for International Development, Afghanistan Procurement Support Office located in Bangkok, Thailand in conjunction with the USAID Mission | Type: Presolicitation | Sol#: RFP-306-05-006-APS
AGENCY FOR INTERNATIONAL DEVELOPMENT / AGENCY FOR INTERNATIONAL DEVELOPMENT / USAID/AFGHANISTAN
The United States Agency for International Development, Afghanistan Procurement Support Office located in Bangkok, Thailand in conjunction with the USAID Mission in Kabul, Afghanistan intends to issue a solicitation for infrastructure programs in Urb | Type: Presolicitation | Sol#: RFP-306-05-009-AP
AGENCY FOR INTERNATIONAL DEVELOPMENT / AGENCY FOR INTERNATIONAL DEVELOPMENT / USAID/AFGHANISTAN
The United States Agency for International Development, Afghanistan Procurement Support Office located in Bangkok, Thailand in conjunction with the USAID Mission in Kabul, Afghanistan intends to issue a solicitation for infrastructure programs in Ver | Type: Presolicitation | Sol#: RFP-306-05-008-AP
DEPT OF DEFENSE / DEPT OF THE ARMY / USACE
The Invitation For Bid has been canceled. | Type: Presolicitation | Sol#: W911WN08B0013
AGRICULTURE, DEPARTMENT OF / FOREST SERVICE / WILLAMETTE NATIONAL FOREST
Type: Presolicitation | Sol#: R6-18-07-44406
AGRICULTURE, DEPARTMENT OF / FOREST SERVICE / USDA FOREST SERVICE
Trail Maintenance contract items, both Wilderness and Non Wilderness, on approx. 450 miles of trail on the Clearwater National Forest, for routine trail opening, rock removal, and drainage maintenance. May include some Trail Brushing contract items. | Type: Presolicitation | Sol#: RFP-R1-5-04-29
AGRICULTURE, DEPARTMENT OF / FOREST SERVICE / USDA FOREST SERVICE
Pete King Creek Trail No. 105 Construction/Reconstruction on the Lochsa Ranger District, Clearwater National Forest, Idaho County. Work involves 1.8 miles of new construction and 0.7 miles of reconstruction. Included is removal of several sections | Type: Presolicitation | Sol#: R1-5-05-4
AGRICULTURE, DEPARTMENT OF / FOREST SERVICE / USDA FOREST SERVICE
Cliff Creek Trail #226 Construction/Reconstruction on the Lochsa Ranger District, Clearwater National Forest, Idaho County, Idaho. Work involves 1.2 miles of new construction and 2.9 miles of reconstruction. Included is armoring two stream crossing | Type: Presolicitation | Sol#: R1-5-05-6
AGRICULTURE, DEPARTMENT OF / FOREST SERVICE / USDA FOREST SERVICE
Pedro Ridge Trail #917 Construction/Reconstruction on the Powell Ranger District, Clearwater National Forest, Idaho County, Idaho. Work involves 0.2 miles of contruction (relocation) and 4.8 miles of reconstruction. Included is rebuilding tread, in | Type: Presolicitation | Sol#: R1-5-05-7
AGRICULTURE, DEPARTMENT OF / FOREST SERVICE / USDA FOREST SERVICE
Wind Lakes Trail No. 24 Construction/Reconstruction on the Powell Ranger District, Clearwater National Forest, Idaho County, Idaho. Work involves 0.3 miles of new construction and 2.6 miles of reconstruction. Included is construction of puncheon br | Type: Presolicitation | Sol#: R1-5-05-5
AGRICULTURE, DEPARTMENT OF / FOREST SERVICE / USDA FOREST SERVICE
The work consists of fabricating and installing steel structures and culverts for mine closures at 7 locations on lands administered by Palouse Ranger District of the Clearwater National Forest. Fabrication consists of supplying steel bars that are | Type: Presolicitation | Sol#: Reference-Number-R
AGRICULTURE, DEPARTMENT OF / FOREST SERVICE / USDA FOREST SERVICE
Work involves .2 miles of construction (relocation)& 4.7 miles of reconstruction. Included is rebuilding tread, installing erosion control devices, and rebuilding hazarous puncheon bridges. Motorized equipment will not be allowed on this wilderness c | Type: Presolicitation | Sol#: R1-5-06-027